Busselton Foreshore Redevelopment December 2011
Busselton Foreshore Update December 2011
A Master Plan is in the final stages of being developed for the Foreshore development from the initial Concept Plan. This will be put to Council for approval 21 December and then go out to the community for comment once approved.
Coastal Defences
In November work was well underway for Phase 1 of the 400 metre long sea wall between Gale and Queen Streets.

Construction of the wall is utilizing the existing iron stone rock beneath the current structure plus the provision of an extra 6,500 tons of granite. The wall is 4 metres above sea level, with a 3 metre wide crest to it, and a 1 in 2 slope and is being undertaken by Italia Stone Group who have had extensive experience on this type of project.
Feature rocks are being placed within the wall, together with large rocks for seating and access down onto the beach.
Sleeved piles have been installed in readiness for Viewing Platforms

Planning for Youth
During August Convic Design who were appointed to develop a concept design for the Youth Recreation Precinct undertook extensive consultation with youth and community user / stakeholder groups. The new Youth Recreation Precinct will comprise the replacement building for Scout Hall, a new skate park and a new adventure playground to replace Yoganup Park.
A concept design is being finalized and the consultants will present this at a public consultation session on 14 December 2011 at the Youth Centre, Bussell Hwy.
Investigations are currently being undertaken into play equipment for installation in the precinct.