Smiths Beach Methodologies February 2004
Submitted by City of Busselton on 13 June, 2007 - 12:11
In order to progress the orderly and proper planning of the site and to assist with the preparation of the DGP, the following Methodologies have been prepared:
- landscape/visual;
- environmental;
- drainage; and
- wastewater disposal
The Methodologies are designed to:
- form the basis for determining opportunities and constraints associated with the subject land;
- assist in identifying the "developable area"; and
- inform the content of the reports which will be prepared in association with a Development Guide Plan.
| Attachment | Size |
|---|---|
| Smith Beach methodologies | 217.16 KB |
